New! and Improved!

Now that our book is almost out (and it IS out on Safari Rough Cuts), I've decided to start a new website, where I will blog as well as posting articles and interesting links. This blogspot will be deprecated and I'll be transitioning over.

Please visit the new site, lisacrispin.com, and comment. I'm developing it with agile practices and I need "customer" feedback!

My old website will remain as a prime location for new action photos of the wonderfully agile miniature donkeys, Chester and Ernest!

Wednesday, December 17, 2008

Tester-Developer Ratios on Agile Teams

A question that came up yesterday on the Agile Testing Realities discussion, and that comes up a lot everywhere, is "What is the ideal tester-developer ratio on agile teams"?

Naturally, the answer is "it depends". Here are some factors to consider:
  • Are the developers doing a good job of TDD? Does the team use acceptance tests to drive development, also?
  • How good is the automated regression test coverage?
  • How good is the communication between developers and customers?
  • Is the application testing-intensive, or does testing go pretty fast compared to coding?
  • Do the developers help with testing activities such as automating acceptance tests?
My current team works with a financial services web app that is quite testing-intensive. The functionality is complex, and since we are dealing with peoples' money, we have to get it right. For some stories, testing takes more time than coding. Our programmers are quite experienced in TDD and our regression test coverage is excellent. While our developers and customers sit close to one another and communicate well, and the developers have a high degree of domain knowledge, our stories are often quite complex. A lot of tester time is devoted to working with customers to get examples of desired behavior and sort out technical challenges and other questions. The developers take on a lot of testing tasks, including automating FitNesse tests and often writing the FitNesse test cases themselves. We have five programmers and two testers, and even so, the developers often have to pitch in extra on testing.

I worked on another team of 20 more more developers (subdivided into smaller teams but all working on one project) where I was the only official tester. While the team did a good job of TDD, and we had good communication with customers despite the fact that we were a distributed team, this was clearly not enough. Fortunately, we were developing a non-critical internal application that would be used by a few expert users, so it wasn't the end of the world if the functionality wasn't perfect. One or two developers or business analysts wore a tester "hat" each iteration and performed testing activities. I worked hard to transfer my testing knowledge to everyone on the team, so that our unit tests covered more test cases, and we could automate at least some of the functional regression tests.

My third successful agile team consisted of 8 programmers and me, the tester. At first, the programmers could not get a handle on TDD or even unit test automation after coding, and I was buried. I asked our coach for help. He helped us figure out how to get traction on unit testing, by providing training and time to learn. Once the team mastered TDD, and pitched in on functional test automation, I was able to handle the other testing activities and we all worked well together.

Those are my stories on tester-developer ratio. Got any of your own to share? Please comment.

Tuesday, December 16, 2008

Agile Testing Realities

Today I participated in an Agile Testing Realities live Q&A discussion with Elisabeth Hendrickson, Tauseef Kahn and Tom Wissink. It was fun and interesting, especially hearing Tom's experiences working on huge government projects (how fun would it be to work on the Hubble Telescope?)

I was frustrated, though, because there were so many excellent questions being posted, and we only got to a fraction of them. So, I've decided to start addressing some of the question areas here. If you posted a question in the session today and didn't get it answered, feel free to send it directly to me. Another good forum is the agile-testing Yahoo group.

Test automation is a big challenge for everyone and I noticed questions related to "How can I get tests automated with back-to-back, short iterations? I don't have time". Obviously, I can write whole book chapters on this subject, but here are a few key points for a successful automation strategy:

  • The whole development team, not only the testers, needs to tackle test automation.
  • Start by implementing a continuous integration and build process so you have a way to run your tests automatically, and get quick feedback from them.
  • Unit tests have the best ROI, so start test automation efforts there. For legacy code, try a lightweight automation tool and do simple smoke tests that don't have a lot of logic in them and are easy to maintain. You'll be surprised how many regression bugs they find.
  • Cut down the scope of work your development team commits to in each iteration so you make sure there is time to finish all test automation tasks. Don't put them off until the next iteration - that's the road to perdition.
  • Repeat this mantra, write it on your story board or whiteboard: No story is done until it's tested! This includes automating regression tests for it too!
Test automation obviously has many more facets. What about exploratory testing, what about non-functional tests such as performance and security testing? We'll need more blog posts for those.

Wednesday, October 15, 2008

An Example of How Testers Contribute

Here's an example to support my previous post about the "hidden resources" that may be lurking in testers, but not used for whatever reason (lack of support from team or managers, lack of time, lack of resources, lack of imagination).

Our web-based app manages all aspects of 401(k) plans, including doing trades. Lots of money moves around, but a lot of it moves around outside the app itself, in QuickBooks, via emails to a custodian, and so on. We, the development team, is quite expert in the 401(k) domain, and fairly lacking in the accounting domain.

We had a story three iterations ago to "tweak" a report so the accountant could use it to help track down the sources of problems when the cash accounts didn't reconcile. This was a small story, but because we never took time to really understand the big picture of how cash flows around the system (both inside and outside of the app itself), and really understand what the accountant needed to do, it grew into a giant story. There were plenty of issues that to me were smells. It was difficult to test because we didn't have production-like data for it and couldn't produce it; the results of running the report were erratic and not always explainable; it turned out that if certain batch processes ran at the same time, the data for the report would be corrupted and become useless.

Long story short, I raised all kinds of flags, but there was pressure from the business to just get this "little" story done. Although both the programmer and I spent time with the accountant trying to understand what was needed, we didn't even learn enough to know that we didn't know enough. We went through two iterations of fixing and re-releasing, to no avail. We wasted time in meetings discussing how to fix the report, when in truth the report was the wrong approach for what the accountant needed from the get go.

I finally convinced everyone that we needed to take a step back and have the accountant explain to us the larger picture of how she has to reconcile accounts, all the different ways money can move around and the possible sources of imbalance, and what information she really needed to have. It was finally decided that a completely different report was needed. The time on this story was wasted, except for the lessons we learned about how little we understood about the accounting domain.

Was it my job, as the tester, to put the brakes on this story and insist that we start from scratch to understand the requirements? No, the programmer could have raised that issue, or the ScrumMaster, or the product owner (the poor accountant tends to get ignored, for no good reason other than accounting doesn't sell 401(k) plans, and she was already doing all she could to try to make herself understood). However, my testing of this report showed that there were some basic issues in the system itself that would have to be fixed before this report could work, so either we had to address those with new stories, or take a different approach to get the necessary data.

I feel that as the tester, I had a better opportunity to see the big picture of what was going on. I took some time to sit with the accountant and understand more about her domain, and what she needed for her reconciliation process. We testers can detect smells and provide information about them to the rest of the team. We can, as I did in this case, bring together customers and developers to re-think a problematic story. I didn't throw myself down on the floor in a fit and say "we can't release this report because I don't think it works". I explained the various issues and asked if key players could meet to understand the problem and find a new approach.

I think many testers would do just what I did, but some may feel it's "not my job", or not feel confident enough to call for a dramatic change in approach. How can we empower all testers to dig into problems and bring together all the people needed to solve them?

Wednesday, October 8, 2008

Testers: The Hidden Resource

I spent last week at STARWEST, and enjoyed being amongst the fine testers who are interested in learning new things and delivering value. I learned a lot myself - great Ajax testing tutorial by Paco Hope, fun six hat idea from Julian Harty, and more.

I didn't have as much time as I would have liked to join in the interesting evening discussions at the Lost Bar (I had a lingering cough to tend) but we did have a brief discussion of how to raise the standard of the testing profession. I feel there are too many people calling themselves testers that are basically punching a clock, waiting for work to fly over the wall at them, and doing some manual scripted testing. It gives testers a bad name.

Someone suggested maybe we should invent a better title than "tester" to attract good people. Personally I am proud to be called a tester, but then I think back to my mom, a career secretary who had a business degree and good business knowledge, but insisted on being called a 'secretary'. She felt it was an honorable profession, and the title was not demeaning. Despite herself, she became an executive assistant.

Yesterday it occurred to me that maybe the way to approach this is to get employers interested in mining the hidden resources of their testing and QA teams. Testers have a lot to contribute. We're good at talking to customers and understanding requirements. We're good at raising a flag when we see a problem or a gap in communication. (I just raised one yesterday, because our accounting person is not getting the software support she needs, because we don' t understand her domain). We're good at collaborating with developers to help them understand the stories and help ourselves understand the architecture and design. We're good at writing test cases, and good at exploratory testing that helps the whole business learn more about how to improve the software.

But most companies leave testers' potential untapped. This is a waste. What if managers sent all their testers to at least one good conference a year, or if that's not in the budget, at least to local user group meetings? What if managers budgeted time for testers to learn and improve their skills? What if managers helped break down barriers between teams and enable collaboration? What if managers supported testers and gave them a chance to show how they can contribute?

Some of us (such as yours truly) are pushy and we step up and do these things for ourselves, but there's no reason businesses shouldn't help testers help themselves, and in turn, contribute more value to their teams. When I've managed QA teams, I helped each team member set goals for professional development, gave them time to learn, bought them the books they needed, got them the training they needed. I had amazing teams of self-motivated people who worked together well and collaborated with customers and developers well (and this was in my pre-agile days). I'm not saying I'm some genius of a manager, I'm saying that giving time, training and support pays off in spades.

How can we get the word out to those that don't understand the huge hidden resource which may lie in their testing and QA teams?

Wednesday, September 17, 2008

Agile Acceptance Testing

Gojko Adzic has been doing some good writing on acceptance testing in agile development. See his article here: http://gojko.net/2008/09/17/fitting-agile-acceptance-testing-into-the-development-process/
I'm not sure whether Gojko considers acceptance testing as a part of what he calls 'normal agile development' or not, but to me, it's an integral part of development. I see coding and testing as two parts of a whole. I wrote a long posting in response to his post, and so as not to waste it, I'm going to include it here too.

Here's an example of the business-facing testing activities we do during the iteration. I wish I could do a nice graphic like Gojko.

Day before start of iteration - product owner goes over stories with us, we ask questions, get some examples, perhaps break a big story into thin slices, go away and think about it. Examples and overview may be put on wiki, along with any pictures/flow diagrams drawn. Product owner posts "conditions of satisfaction" for each story on wiki.

Day 1 of iteration - Retrospective, then iteration planning, we write and estimate task cards for all coding and testing activities for each story, until we have enough stories to keep us busy for at least the first few days of the iteration. Testing cards for each story might be "Define high level tests", "Write FitNesse test cases", "Manual exploratory testing", "Write GUI smoke test", "Obtain test data". Then demo last iteration to customers. Then release last iteration's code.

Day 2-3 of iteration - Write high level test cases, which involves more discussions with customers, perhaps design meetings. Do paper/whiteboard prototyping with customers where needed.

Day 2+ - When a programmer picks up first task card for a story - start writing detailed test cases, in FitNesse if that's possible for the story. When a happy path FitNesse test passes, write more interesting test cases, collaborating closely with programmer (sometimes it's the programmer writing the FitNesse tests)
When a testable chunk is available for exploratory testing, start on that. Show things to customers and get feedback whenever possible.
When all coding task cards are done, do exploratory end to end tests, automate GUI smoke tests where appropriate. (Or if we're working in thin slices, do this for each slice).

We focus on completing one story at a time, in priority order. Not everyone can work on one story, but the idea is we are trying to get stories done. Bring in more work as we have room. If we took on too much, figure out what to set aside, and focus on finishing.

So not all our integration and exploratory testing is done the last couple of days, it's spread out more. On the last day, we are wrapping up the last story or two.

If we have a big theme coming up, we write cards to have brainstorming, research and design discussions for an iteration or two in advance of actually starting on the stories.

For my team, we've found that getting into too much detail in advance wastes time and leads to confusion. We do try to get examples, but we try to keep the discussion pretty high level and not get too much into details.

Thursday, September 11, 2008

Much Ado About Agile! Agile Vancouver 2008

I am fortunate enough to have been invited to present at Agile Vancouver (www.agilevancouver.ca). They're calling their conference "Much Ado About Agile", and Ken Schwaber is giving a keynote. Here are just a few of the presenters: Jim Shore, David Anderson, Janet Gregory, Frank Maurer, David Hussman, James Grenning, Jennitta Andrea. It's scheduled for Nov. 4 - 6, and registration will open in the next few days.

I'm doing a track session called "Are Agile Testers Different?" and a tutorial on an iteration in the life of an agile tester. I'll only get to do the tutorial if enough people sign up, so if you're interested, please sign up early!

The best part of any conference is the informal connections you make, talking to people facing the same issues you face, getting lots of ideas and inspiration. This conference will be a wonderful opportunity for that kind of networking. And it's put on by a fabulous group of volunteers, who are going out of their way to give back to our agile community. Please consider it!
(And a note to U.S. residents - flying to Seattle and renting a car to drive to Vancouver is WAY less expensive than flying straight to Vancouver, plus, I think you still don't need a passport at the border if you drive, but I could be wrong about that).

Tuesday, September 2, 2008

Agile Book Writing

Janet and I turned in our "final" manuscript (still have copy editing, proofreading etc to go) last night. The book is available for preorder on Amazon. on Amazon - how do they know how many pages it will be???

One cool thing (at least, in our opinion) is that we used agile practices to write the book. A year ago, we got together and mind mapped the whole book. Janet came up with a release plan, and we started in on it. We had two-week iterations. At the start of each iteration, we mind mapped two chapters, then started writing. We used an ftp site to keep the latest version of each chapter, and to pass chapters back and forth. (This was important, because otherwise it would've been easy to lose track of the latest version, or 'walk on' each others' changes). We each had a folder - 'Awaiting Janet Review', 'Awaiting Lisa Review'.

At the end of each iteration, we 'released' two chapters - that is, we posted them on our book site for review by our volunteer reviewers. We used a spreadsheet on Google Docs to help our 'source code control', checking chapters in and out. We also kept a 'to do' list and notes for the bibliography on Google Docs.

We got continual feedback throughout this development cycle. We were able to visually share ideas with our mind maps (using MindJet MindManager software). We kept in constant touch with IM, and met a couple of times in person. We build a couple extra weeks into the schedule during the holidays, and kept working at a sustainable pace (it's really hard to write a book when you have a full time job!)

By March, we had all the draft chapters posted and informally reviewed. Janet put together a new release schedule to revise all the chapters in time to send our draft manuscript to the publisher June 1. We did a major refactoring of the book, moving sections around and completely reorganizing the automation section. We made our deadline, although I confess we were more 'agile' about our release plan, we worked on the chapters in a different order than planned.

We waited a few weeks for our official reviewers to give us their feedback, then we did the last, most punishing stretch, making our final revisions. We again did a fairly major refactoring, eliminating two chapters and folding the information in them into different chapters where it made more sense.

If we took even more time, we're sure we could make the book even better. In fact, we've gotten some ideas here at the end that we could have used. However, people have been clamoring for this book (which is gratifying) since we started writing it. Every time we go to present at a conference or help a team, people want to know when it will be out, and complain when we say "January 2009". We feel (and so does our publisher) that it's better to get some really useful information out earlier, rather than to keep polishing the book and get a more perfect book out later. I don't know about you, but that's how my agile development team works, too.

It's been really interesting to see how we were able to apply agile values, principles and practices to writing a book, as well as to developing software. Wonder what else could be done better with agile!


Tuesday, August 19, 2008

Alternative Metaphors for Technical Debt

Brian Marick (see link on side nav) has been blogging about new metaphors for technical debt. He used "fertile assets", a gardening metaphor, which I like. If you don't amend the soil and plant your seeds at the right depth and weed thoughtfully, you won't get a good harvest. You might garden rather lazily like me and use ground covers and minimum tillage, but those are still good practices and produce good results. But if you let all the weeds grow up, it might be hard to remove them without damaging the good plants. Just like code that's hard to change if you don't have automated tests to tell you something got damaged.

I like Brian's metaphor, but to me, it's too positive. If we don't protect our code with tests, and don't refactor continually, and just hack in code changes without thinking, we won't just have a bad harvest, we might ruin the soil so it can't grow anything again.

I think technical debt is more like global warming. Lots of people claim it's just a myth and that we can ignore it. If I, as a tester, try to use good practices, but the programmers don't, it's like Denmark being green but not China. If everyone collaborates on a solution, emissions will go down quicker, and we will all breathe easier.

But, since global warming is a politically charged subject, it will get people arguing about that instead of thinking about how to make teams understand how shortcuts, poor design and lack of automation will grow an ever-larger burden for them to carry.

I'm now working on a metaphor that involves donkeys, perhaps log skidding. Recently my friends cut some small trees and branches near their creek bottom to make room for a bridge. We used the mini donkeys to haul the wood and brush over to the cabin's woodpile. If we tried to put too many logs in the bundle, or tied them so they dragged too much in the dirt, the donkeys had trouble pulling them up the hill. If we didn't take the time to tie them together well, they fell off. But when we took enough time to prepare optimally-sized, securely-tied, drag-dynamic bundles, we could make quick trips, and the woodpile grew fast. A little experimentation taught us that cutting corners didn't pay off.

Thursday, July 24, 2008

Optimizing with a Remote Team Member

Last December, our manager moved back to India. He's still a VP and still writes code, although he's not our direct manager anymore.

Although he arranges his hours to accommodate us, working until almost midnight his time, there are still those hours where he's working and we're asleep. Sometimes he's left with no work to do, especially the first day of the sprint when we haven't planned our work yet.

This sprint we're trying an experiment. Our sprint starts Friday. On Wednesday morning, we had a meeting with the remote team member (let's call him "G"), our ScrumMaster, the product owner, our manager, and me (a tester, so I could get the feel for how much testing might be involved). The product owner had come up with three stories to "earmark" for G. We discussed the first story at some length, as it's rather complex and involves a business partner. We didn't discuss the other two stories. G felt the first story would keep him busy for a few days.

He proposed to write his task cards on his Friday morning, and go over them with the rest of the team in our sprint planning. (Now, for all of you who are down on task cards now, I can see why, but it's working for our team). We'll have to write the testing task cards then, too.

Today (Thursday), we had our "pre-planning" meeting. We went over the stories earmarked for G, plus the other stories that might be in this sprint. Tomorrow we will plan the sprint.

The three stories for G add up to almost as many points as the whole team does in a sprint. Now, G is a superman, for sure, but that seems kinda crazy. I have raised this issue. What if G stays busy for several days with Story 1, and other developers on the team free up? Do they have to keep their mitts off G's other stories?

But it's just an experiment. We'll see how it goes. Do you have a distributed team? How do you make sure everyone always has enough work? Please comment.

Friday, July 18, 2008

Agile Tester Skills

A StickyMinds column by Johanna Rothman about exploratory testing on agile projects prompted a discussion about what skills agile testers need on the agile-testing mailing list.

Janet Gregory posted this response, I thought it was insightful.

Johanna talks about the perfect tester skills but acknowledges generalists without coding skills may have a place. I have seen a few teams where none of the testers had coding skills, but worked with the developers to create the automation framework using FIT or some other similar tool.
If the team works closely, and develops a framework that the 'non-coding' testers can use easily, the testers can be very productive. I do agree that it helps the team if the testers can code, but it is not absolutely necessary. Because the whole team is responsible for quality, the whole team usually can solve any problem.
I think that some of the most valuable skills a 'tester' can bring to the table, are critical thinking and understanding of the big picture - implications of proposed changes. Exploratory testing helps to expose issues if testers have those skills, and can use them properly.

She adds in a later post:
I didn't take it one step farther which is to say, that many of the "manual" testers who started using the spreadsheets for Ruby/watir implementation, eventually got comfortable enough to start understanding the code and actually doing some of their own scripting. That shows initiative and proves that everyone is capable of learning :-)
I do think it is absolutely beneficial to understand scripting and coding, and I do encourage learning those skills. I think testers will go so much farther if they do. However, it is important that we don't discourage those testers that don't have any coding skills when they first come to an agile team. I guess those are the testers I work with mostly.

I've worked with "manual" testers who were happy to learn new skills such as automation when given the time and support they needed. I've met so many teams where the testing team freaked out when the development organization adopted agile. Telling testers they need these skills they've possibly never had the chance to acquire is not going to help with the transition.

I also know lots of testers who had no interest in learning new skills or improving. People like that won't fit on an agile team, for sure. But anyone who gets excited about agile and wants to work on an agile team is worth a bit of investment, in my book.

Tuesday, July 8, 2008

The "Not My Job" Game

Expanding on last week's post...

The NPR news quiz show "Wait Wait, Don't Tell Me" always includes a segment called the "Not My Job Game". A celebrity has to answer questions about something completely unrelated to their own profession. Sometimes, through logical thinking, intuition or both, they're able to guess the correct answers.

Agile team members play this game every day. OK, maybe the questions or tasks aren't completely unrelated to our normal job, but we don't worry much about whether something is really our job or not. If it needs doing, we do it.

My team is about to embark on a theme to rewrite the code that produces account statements we send out for every 401(k) plan participant. We have several outstanding issues about the statements, and I wasn't sure if they are bugs or stories, as we are going to rewrite the statements anyway.

I asked the product owner and the head of plan administration for a quick meeting. We discussed each issue, and decided that the product owner would write new stories to ensure they are addressed. We'll probably need an engineering meeting to talk about potential solutions for one or two of them. Then we'll estimate the stories and we'll have a better idea when we'd better start on this theme, because it has to be done in time for the 3rd quarter statements.

Was it my job to worry about writing stories and organizing this meeting? Some people might say that was the job of the ScrumMaster, product owner, coach or manager. I didn't want these issues to fall through the cracks. Nobody here thinks it's weird when a team member takes on a task such as this.

This is one thing I love about agile development. Each of us is empowered to take the action needed to make sure we can deliver the most business value.

Thursday, July 3, 2008

What an Agile Tester Does

This has been kind of a crazy week. I've had to multitask a lot, which I know is bad and inefficient. Here's a sample of the types of tasks I've done this week:
- Write high level test cases
- Automate tests in FitNesse
- Debug problems with Canoo WebTest GUI tool and tests
- Look into three different production issues
- Manual exploratory tests of various stories
- Participate in estimation meeting
- Spend a lot of time getting requirements and clarifications from various customers
- Help team strategize best way to make sure we get everything completed this sprint

If you're an tester on an agile team, are those in line with the things you do? Are you surprised by any of them?

I think some people might not expect a tester to work on production issues, but as testers, we tend to learn a lot about the business domain. It's natural for business people to come ask me where something is documented on our wiki, or how a piece of functionality is supposed to work (at least, how we delivered it, maybe we were wrong on how it should work!) I get interested in production problems because I want to know how we didn't run across a particular issue in testing. Working on production issues isn't in my job description, I suppose, but it helps me learn a lot about the app and what we can do to improve it.

I know a lot of agile testers who do similar tasks. I'm interested in what other things agile testers do.

Friday, June 27, 2008

Improving

Last sprint was tough, we didn't get finished and we couldn't release. Fortunately this wasn't a big deal, there is no big deadline to meet. However, we only finished one story - that's not good. And it's only about the third time in four years we didn't finish all stories.

We had a long discussion about what went wrong and how to do better. One thing was that although we identified 6 "steel threads" (aka thin slices, tracer bullets) in our big UI story, we didn't finish the third thread until the 7th day of the sprint - at which time most of four more threads were also done. It was incredibly confusing to try to test it, we couldn't tell what should work and what shouldn't, and we missed a couple of gaps in the features. Plus, unit tests were being written after the fact.

Here's our stop/start/continue list that resulted from our retrospective:

Start:
  • Transfer whiteboard drawings from conference room to Scrum arena, and check off threads as they are done
  • First thread of first story has to be done by first Tuesday of Sprint
  • Log remaining hours on task card (in Mingle) prior to Scrum
  • Test first
Stop:
  • Working more than one thread ahead of unfinished thread
We know the steel thread concept works for us - we just have to do it properly. UI stories are harder to do test-first, but we suffer when we don't. Lots of reasons we got off track last sprint, but we think this will get us back on.



Thursday, June 19, 2008

Interdisciplinary Awareness

One of the most interesting sessions I attended at Better Software was "You Just Don't Understand Me: Interdisciplinary Awareness to the Rescue" by Mike Tholfsen, principal test manager of the Microsoft OneNote team. (See his blog at http://blogs.msdn.com/onenote_and_education/) He presented a "Team Pyramid" (don't we love all these pyramids?) showing that for a successful team, you need trust as your base. Results are the little top of the pyramid, they come from trust, healthy conflict, commitment, accountability and results.

Mike feels that one way to achieve this is to help people understand their peers' viewpoints better. He introduced an exercise to help people in different roles on the team understand the important traits of each discipline, and trade ideas on what teammates in other roles like or dislike about each discipline.

An interesting point of the presentation was that there was a development team where all the team members scored the same on a Myers-Briggs style test. The manager had hired himself four times. Lack of diversity is not a good thing.

This made me think about the times we've hired a tester onto my agile team. I brought in testers who were great with communication, collaborating with customers, exploratory testing, but not a lot of skills on the automation/technical side. I felt they could contribute value, but my developer coworkers gave them thumbs down. In each case, we hired a very techy tester (fortunately, also good at all the other things).

Mike's presentation made me realize that the developers were most comfortable hiring someone like themselves. This is understandable, but not always in the best interests of the team. Having realized this will help us in future hiring efforts, I think. Do we really not like something about the candidate, or is it just that they're different than we are? Could the differences make us better?

There appears to still be a lot of controversy in the agile community over testers and their role on the team. Interdisciplinary awareness might help agile teams realize that people with a different skill set might add tremendous value to their team.

Friday, June 13, 2008

Better Software

I attended Better Software this week. Each time I go to a conference such as this, I am pleasantly surprised that more and more people are on agile teams and have a good understanding of agile principles, values and practices. There are also plenty of people wanting to learn about agile.

In my class on "Ten Principles of an Agile Tester", a QA manager described an interesting problem (to which I had no ready answer!) The programmers in her company have decided to implement agile, but they think they can do it all by themselves, in isolation. They feel they don't need the testers, analysts and all the other groups to go along. From what I understood, the programmers felt they could still just hand off the code to the QA group when they were finished, and they apparently believed they could communicate with the customers directly and get the requirements.

The QA manager is understandably frustrated with this situation. She has tried repeatedly to sit down with the programmers and figure out how the testers can work with them, and show them how the testers can add value. They aren't cooperating.

What to do? I was once in a situation where I joined a team that had never had testers, only developers, although they did have BAs. They wouldn't let me join the daily standup, they wouldn't include test estimates in story estimates or in iteration planning, and they declared stories "done" before they were tested. I argued that I should be a part of the team, to no avail. After we missed the release date because the testing wasn't finished, I asked the coach if we could try things my way, and work together all as one team, everyone taking responsibility for testing, not considering stories done until they were tested. He agreed to try it for the next release cycle. We released on time and the customers were happy. So there was no more debate.

In my experience, sometimes people have to feel the pain before they'll change. I know for sure that evangelizing doesn't work. (Blogging feels a bit like evangelizing which is one reason I never did it before).

I'm interested in your comments, if you've ever had a situation like this, what did you do?

BTW, a couple of posts back I mentioned that we were tracking our refactoring tasks in our DTS, in our online story board tool, and in our Wiki. We have decided to try tracking them only in the online story board tool, as task cards, and add some fields so we can find them easily and include all the information needed before and after doing the task. We'll see how it works! Experimenting is good.